The bedroom:
We've now completely finished the wood floors, we've installed the door, and the door knobs.
Today I started painting, and we should be completely DONE with this room within the next couple days.
The bathroom:
The shower is completely finished, including all of the plumbing. We've installed the vanity, the sink, the lights and the mirrors. Jay installed the toilet today, and with a few touch-ups on the paint, this room will be completely done in a day, or two at the most.
Here's a picture of the shampoo shelf =)
I'll have more pictures up for you asap! =)